|
The amusement rides produced at Interactive Rides are designed to exceed the Standards of the industry including ASTM F24.
Not only does our engineering team deliver the highest quality rides in the industry, our engineers and project managers can help owners and managers maximize their returns by designing rides that will operate as planned. Interactive Rides offers maintenance services to ensure that the proper maintenance and safety standards are being met. Our engineers have successfully designed extreme rides that cost owners less money to operate. Interactive Rides employs world class amusement ride designers that have more collective experience designing and building quality rides than any other company in the world. One of Interactive Rides core competencies is the ability to design a ride that will meet your expectations in reality, not just on paper.
Each portion of the design process is scrutinized and processed many times before an component is added or finished. Structural members undergo a rigorous analysis review. This ongoing process is initiated during the design phase and completed after test data is collected and reviewed. Analysis reports including test date, Finite Element Analysis (FEA) and structural calculations are generated by: Specialized Analysis Engeering, Inc (SAE, Inc.) Detailed analysis reports accompany all rides sold by Interactive Rides. Interactive rides has overcome difficult challenges, when the ideas seem to be near impossible. Our dream team of engineers has come through every time, and we have never had a reported accident on any of our rides. We have scrapped ideas and projects in the early stages of the design process because our engineers know if a ride will be too dangerous or too expensive to maintain. Our experience and creativity cannot be matched, there is no better source for your amusement needs in the world.
|
|
Design Structure
- Exceed code requirements
- Design for an inifinite life
- 'We do our homework' - We know our calculations are correct.
- Detailed Calculations: No "seat of the pants" engineering
- Verify our calculations and assumptions through testing
- Document our calculations and stand behind them

|